Bord and pillar mining Next. This diagram shows the traditional method of bord and pillar mining. Miners first extracted coal along roadways or bords, while the coal in between the bords acted as pillars holding up the roof. Then the outer pillars were mined, leaving the roof to collapse in a controlled way as miners retreated to the exit.

Underground mining is conducted using conventional drill and blast methods (including total extraction mining, i.e. stooping), as well as fully mechanised, continuous miner equipment on a bord and pillar system. Opencast mining is undertaken using the strip mining method with dragline.

Bord-and-pillar Summary: Wessels is an underground bord and pillar operation with a current capacity of approximately 1.2 Mtpa of ROM production (100 per cent basis).

General, a pillar greater in size than 18 m x 18 Tm is split up into two stooks. In a large pillar of 30 m x 30 m size between centres, one split 3.5 m wide in the middle of the pillar along the strike and another split of similar width in the middle of the pillar along the dip, are driven so that the pillar .

Basic parameters of bord and pillar mining system 1. Gallery (bord) 2. Pillar. 3. Junction. Calculation of percentage of extraction during development If coal from the full seam thickness is extracted, the percentage of extraction during development is nearly 20% in deep mines and 35% in shallow mines.

Room (Bord)-and-Pillar Layout. ... In room & pillar mining, high safety levels in design is important, and to achieve this, understanding the behaviour of the pillars is essential. It is ...

CW: The primary benefit of bord and pillar mining is that for an equivalent production the capital cost of a bord and pillar operation would be 45% to 65% of that of a longwall mine. The operating costs may be 30% to 60% more than a longwall, but the risks are significantly less and production variances are very low compared to longwall.

May 31, 2017· Bord-and-pillar extraction is the older of the methods, and The word "bord" is not a misspelling of "board", but a mining term for an underground space or .

May 08, 2013· Bord and Pillar Method, Mine Ventilation, by OcS () OcSTeam. ... - Block Caving Mining Method - Duration: 3:17.

Our cutting tools for bord and pillar mining fit either continuous miners or roadheader machines. They feature a hardened steel body/shank fitted with a wear and impact resistant tungsten carbide tip. Depending on the application, we also...

ADVERTISEMENTS: Mining Methods: Longwall, Horizon and Level Mining Methods! Apart from the commonly practiced "bord and pillar" method of mining followed in this country, the other methods of mining adopted in some collieries are: 1. Longwall Mining Method 2. Horizon Mining 3. Level Mining or Semi-Horizon Mining Room and pillar method of mining is not [.]

Underground Mining. Throughout the years, Moolmans has built extensive experience in coal, platinum, gold, copper and manganese mining, encompassing various mining methods, such as bord and pillar.

Jan 01, 2001· Bord and pillar mining started in 1908. The average pillar size left behind was 6×6 m and the average bord width was 7 m, so the extraction ratio was approximately 60%. The average mining depth was in the region of 18–20 m, with a mining height of 2.5 m.

Room and pillar. Room and pillar is also known as bord and pillar is a mining system in which the mined material is taken out across a horizontal plane while leaving "pillars" of unscathed material to support the overstrain leaving open regions or "rooms" underground.

On August 9, the commission announced its final decision, which was to approve part of the application. It said this was because "mining operations have been approved until 2022, and bord-and-pillar mining has been acknowledged by the proponent and department as a less intensive and environmentally impacting activity than longwall mining".

will no longer build tracked drills, bord and pillar mining machinery. August 19, 2016 News Ben Creagh Cole Latimer. Latest News. Follow the leaders: This week's appointments ;

Room and pillar is an underground mining method that has applications to a wide variety of hard-rock deposits worldwide. It is commonly classified as an open-stoping method, meaning that development involves mining out underground cavities while leaving the .

Feb 27, 2016· Bord and Pillar method of mining is one of the oldest methods. 3. INTRODUCTION In India, about 98% of underground output of coal is obtained by Bord and Pillar method and barely about 2% by longwall methods. The other countries where Bord and Pillar method predominates are Australia, The USA and South Africa.

Longwall Mining (41) Overview (6) Equipment (17) Shearer (8) Powered Supports (3) Ventilation (3) Change Out (7) Ground Control (8) Bord & Pillar (15) Method (7) Traditional Pillar Extraction (2) Panel & Pillar Extraction (2) Modern Pillar Extraction (2) Equipment (5) Ground Control (1) Ventilation (2) Rock Bolting (20) Overview (2) Types of ...

Bord-and-pillar definition is - of or relating to a system of coal mining in which tunnels are driven in a checkerboard pattern having massive square pillars between them .

Conventional bord and pillar mining in thick seams is associated with very low percentage of extraction [around 30% in a panel] even under favourable conditions. Extensive development of pillars carried out earlier in thick seams had also resulted in large reserves of good quality coal locked up in developed bord and pillar workings [over 2,500

Mar 24, 2013· Bord and pillar, (same as board I guess), Post and Stall, Stall Worked, and here is one up for grabs, for some reason I cannot shake off the thought that I recall this method being referred to as Pillar and Post locally at least, I know that it seems to be nonsensical by virtue of both terms being support methods, but we are a queer lot in this corner anyway (tail-gate corner that is, probably ...

different bord-and-pillar layouts were designed. These layouts were then evaluated according to dilution, produc-tivity, cost implications, profit and mining flexibility and the most suitable layout was chosen. Bord-and-pillar mining was then compared to conven-tional mining according to the following: financial analysis, dilution and flexibility.

Large room-and-pillar stone mining fundamentals The value per ton of ore for large room-and-pillar stone mines is typically low, therefore productivity must be high. Typical face areas are 12.2 m wide x 7.6 m high (40 ft wide by 25 ft high) with 4.3 m (14 ft) pulled with each blast (Figure 1). This equates to over 1,000 tons of stone per