Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree, you can also shop for superior quality cement bags at best market price.

Jul 03, 2011· Me think the righter is a bit conservative with his calculations. first 1m3 of concrete requires 1.52m3 of dry material for mixing due to shrinkage of concrete on setting. so, for 1:2:4 mix, Cement = 1/7*1.52*1440/50 (i.e 6.25 bags per m3 of concrete) Sand = 2/7*1.52 (i.e 0.43 m3 per m3 of concrete)

Aggregate calculator Brick calculator Concrete Calculator Real-time graphics. Make the calculations and see the changes. Real-time graphics. Make the calculations and see the changes. ... the units of each measurement are not the same (e.g. density is in pounds per cubic feet and volume is given in cubic .

Jul 24, 2017· The basic formula for this calculation of ft to ton in granite industry is. Length ×width ×hight = total ÷12 =ans example length of block is 10 ft hight 8 ft width 6 then 10×8×6=480÷12 =40 ton so the answer is 40 ton

Aug 17, 2009· To do this calculation, add the sum of ratio 1+2+4=7 Calculate the cubic volume of concrete for foundation. Going by the previous article the total lenght of trench was taken as 65.6m Height of concrete beam is 1.1m or 1100m from image 2 And width is 0.225m or 225mm therefore total volume of concrete beams =65.6m x 1.1 x 0.225 =16.236

Aug 03, 2018· Now we start calculation for find Cement, Sand and Aggregate quality in 1 cubic meter concrete. CALCULATION FOR CEMENT QUANTITY; Cement= (1/5.5) x 1.54 = 0.28 m 3 ∴ 1 is a part of cement, 5.5 is sum of ratio Density of Cement is 1440/m 3 = 0.28 x 1440 = 403.2 kg We know each bag of cement is 50 kg For Numbers of Bags = 403.2/50 = 8 Bags We ...

Concrete Ingredients Calculation. For Cement, Sand and Coarse Aggregate. This is a Volumetric Calculation. Assuming we need 2 m 3 of concrete for M20 Concrete Mix, (Mix Ratio, M20 = 1 : 1.5 : 3) Total Part of the Concrete = 1+1.5+3 = 5.5 Parts. Therefore, Cement Quantity = (Cement Part / Concrete Parts ) * Concrete Volume

So the required concrete volume = 0.42 m 3. Now we have calculated the required volume. It's time to calculate the micro-ingredients. Concrete Material Calculation. For the above slab volume ( 5m x 2m x 0.1m) = 1 m 3. We need 1 m 3 of wet volume concrete of M20 Mix, (Mix Ratio, M20 = 1: 1.5 : 3)

Aug 14, 2020· Relationship Between Concrete Elements: CEMENT - SAND - STONE relationship; In practice a 50kg of cement bag contains 2 head pan of cement; this means that if i have a plan to mix 1 bag of cement my mixing ratio would be: 1:2:4 = 1 bag of cement : .

M20 (1 cement :1.5 sand :3 stone/brick aggregate). To determine the proportions you have to perform mix design, for this you have to find out the sp.gr. of cement, CA, FA, and water cement ratio ...

There are two main ways to design the concrete mix. Design mix method :- In this method, materials are proportioned based on the procedure and rules given in IS 456 (2000) and IS 10262) code . In this method, cement, sand and aggregates are always batched in terms of weight, and concrete can be designed for different environmental conditions and different needs.

Calculate Volume of Square Slab Calculator Use. Calculate volumes for concrete slabs, walls, footers, columns, steps, curbs and gutters. Enter dimensions in US units (inches or feet) or metric units (centimeters or meters) of your concrete structure to get the cubic yards value of the amount of concrete you will need to make this structure.

The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD .

A cubic meter of typical sand weighs 1,600 kilograms 1.6 tonnes. A square meter sandbox with a depth of 35 cm weighs about 560 kg or 0.56 tonnes. The numbers are obtained using this sand calculator. How much is a ton of sand? A ton of sand is typically about 0.750 cubic yards (3/4 cu yd), or 20 cubic feet.

Both concrete calculators make an allowance for the fact that ballast etc losses volume when mixed to make concrete. Two Concrete Calculator are provided for different concrete mixes: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and ; Paving mix - 1:3½ cement:all-in ballast or 1:1½:2½ cement:sharp sand:gravel.

Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix - 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

Calculate the concrete quantity required in cubic meter and then multiply the quantity with the cement sand and aggregate for 1 cubic meter of concrete. In your case Volume of concrete = 1.7 x 1.7 x 0.5 = 1.4 cu.m It looks like you are using m20 grade mix with extra sand. If you follow that mix proportion then to calculate use this following ...

Jan 26, 2017· Contents1 Calculation Of Materials For Different Mix Ratio:2 Calculation For Cement:3 Calculation For Sand:4 Calculation For Aggregates:5 Calculation For Water Content:6 Summary:7 Also Read – Concrete Mix Design. Calculation Of Materials For Different Mix Ratio: Quantity estimation of materials is essentially required in any construction works and quantity of materials depend on the .

how to calculate concrete per cubic meter using 1 2 4. Use our cubic yard calculator for your, How much concrete will sink into 3/8 gravel, 1/2 inch gravel or 3/4 inch, The requirements are 7 cubic yards per pick up How to Calculate Cement, Sand and Aggregate required for 1, How to Calculate Cement, Sand and Aggregate required for 1 cubic.

help on calculating materials for concrete Specify the required proportions. E - The required amount of concrete. Stated in cubic meters. M - How many bags of cement required for 1 cubic meter of concrete. K - Weight of one bag of cement. In kilograms. Enter the cost of the materials in your area.

help on calculating materials for concrete Specify the required proportions. E - The required amount of concrete. Stated in cubic meters. M - How many bags of cement required for 1 cubic meter of concrete. K - Weight of one bag of cement. In .

Aug 24, 2017· In order to be able to calculate the amount of water required for your concrete, you have to know the total volume of concrete you're required to mix and this means you also have to fish out the other elements that make up the entire concrete such as Granite, Cement, sand and water as well.

hw to calculate kilogram of cementsand and granite per . 1 cubic meter of granite weighs nearly 3 tons The density of granite is 2,691 kg/m^3 That converts to 2966 tons (US) To compute the weight of a volume, you multiply the volume by the density and then make the conversion to the units you pref. Get Price