Hans Renold in 1880. Later the principle was applied to conveyor chain giving the same advantages of precision, heat-treated components to resist wear, high strength to weight ratio and high mechanical efficiency. Renold conveyor chain is made up of a series of inner and outer links. Each link comprises components manufactured from

Position of Take-Up The screw take-up should be set about 3" from the full forward position (toward head end of conveyor). The gravity take-up frame should be positioned approximately one foot below the upper stop on the take-up guides. The dimension should be measured from the bottom of the upper stop of the take-up frame. Installation of Belt

alignment of the conveyor frames differs based on their application, the ideal installation would achieve an alignment of plus or minus 1/8" in conveyor frames 50'-0" center-to-center of pulleys length or less. For longer applications 1/4" in 100'-0" with a maximum out of alignment of 1/2" on the length up .

ucts, the specifications in this manual are subject to change without notice. ... and backed up by computerized data to satisfy our ... P X F Max. Xa L D C B N Chain Part No. X-348 13612 X-458 13613 658 77498 X-678 13443 X-348 13612 X-458 13613 658 77498 X-678 13443 ...

IEC Conveyor Switches Safe and reliable conveyor belt control, always ready for action IEC AFU Conveyor Belt Trip Switch General Operation: The conveyor trip switch facilitates stopping the conveyor, in the event of an emergency from any point along the entire length of the conveyor, giving safety to physical harm and mechanical damage.

parts in systems with nonstandard or special order components, use the manual as a reference and call Bi- -line service with the particular job name and location. we convey excellence 3765 Champion Blvd . Winston-Salem, NC 27115 (336) 661-1951 (800) 383-5933 . Fax (336) 661-0498 . 2674 N. Service Road . Jordan Station, Ontario, Canada L0R 1S0

This calculator helps you to determine the maximum angle for smooth, safe conveying. ... Sometimes you need to move a package to the right or left side of a conveyor to properly line up with a labeler, printer, or to track properly through the next conveyor. ... way to accomplish this is to skew the rollers by moving one end of the rollers over ...

PNEUMATIC TAKE-UP - Take-up provides 14 in. of individual belt take-up. 25 PSI max on fi lter regulator. Need one pneumatic take-up per conveyor and one manual or pneumatic take-up for every 50 ft. of conveyor length. RETURN ROLLERS - 1.9" dia. galvanized tube with ABEC bearings. With cardboard tube inserts. Read More

L = Conveyor length in meters. Conveyor length is approximately half of the total belt length. g = Acceleration due to gravity = 9.81 m/sec2. mi = Load due to the idlers in Kg/m. = Load due to belt in Kg/m. mm = Load due to the conveyed materials in Kg/m. δ = Inclination angle of the conveyor in Degree. H = vertical height of the conveyor ...

1. Fixed take up device that may be adjusted periodically by manual operation 2. Automatic take up device (constant load type) Manual Screw Take Up: The most commonly used manual take up is the screw take up. In a screw take up system the take up pulley rotates in two bearing blocks which may slide on stationery guide ways with the help of two ...

Therefore: SC = 1.50 X 3.75 X 333 ft 3 /hr SC = 1,873 ft 3 /hr. The Selection Capacity will be used to select the proper screw conveyor diameter and speed from the Capacity Table. With a recommended trough loading of 30A, the Selection Capacity must be less than the maximum capacity given in .

PPI's Conveyor Design Program is a web based application for conveyor horsepower calculation, selection of pulleys and idlers, and selection of take-up travel length for fixed take-up conveyors up to 1,000 feet long using our Stretch-Rite calculations. Its use is limited to non-regenerative conveyors that don't exceed 2,000 feet in

Conveyor Belt Tensioner, Manual Screw Adjustment, Carbon Steel, 10-3/8 In. Tensioner Retracted Length, 6 In. Maximum Adjustment Stroke, 11/16 In. Bearing Mount Slot Height, 7/16 In. Bearing Mount Slot Width, 700 lb. Maximum Tension Force

The layout of this manual and its easy approach to belt design will be readily followed by belt design engineers. Should problems arise, the services of FENNER DUNLOP are always available to help with any problems in the design, application or operation of conveyor belts.

PULLEY AND TAKE-UP CATALOG phone: 1-800-437-9074 website: ... Conveyor Take-Up Frames Telping Tube Take-Up Wide Slot Take-Up Light Duty Take-Up ... 11.4 Maximum Belt Capacities 11.5 Volumes of Conical and Circular Shaped Stockpiles 11.6 Lift Based on Actual Pulley Center to Center

max and smallest lump, a min is less than or equal to 2.5. Unsized (non-classified) are the materials for which ratio a max / a min is greater than 2.5. Average lump size of a sized material = (maximum particle size + minimum particle size) / 2

• Maximum load: 6 kg/m (40 lbs/ft) • Maximum total load: 316 kg (700 lbs) non-accumulated • Maximum length: 30 m (99 ft) • Maximum speed: 68 m/min (222 ft/min) Note: Conveyor modules may be made up of several length of conveyor frames. Maximum length frame is 120 in) (3048mm). Note: Dimensions = mm (in) 305 mm (12 in) Wide • Maximum ...

not throw down from conveyor gallery. 6. Throw the collected spillage material on belt, only from those positions, where the safety guards are provided on belts as per safety standard SS/ENG-18. 7. Never heap up the spillage material at the tail end of the conveyor. 8. If the spillage material is in large amount (more than one ton), the conveyor 9.

The Conveyor Design. To solve a conveyor problem, certain facts must first be known. This information is essential for sound conveyor engineering: tonnage per hour, average size of material, maximum lump sizes, weight of material in pounds per cubic foot, conveyor pulley centers in feet, whether conveyor is to operate horizontally or on an incline (18° should be the maximum inclination) and ...

• 16" (406 mm) of belt take-up • 6" (152 mm) diameter drive pulley turns approximately 18.8" (479 mm) of belt per revolution • Center Drive Module frees up both ends of conveyor for operator and machine interface • The Center Drive Module can be easily repositioned along the length of the conveyor

7. CONVEYOR TAKE-UP DEVICES In searching for Conveyor Take-Up Actuation, there are a variety of devices to choose from: a) Gravity Tower/Counterweight b) Hydraulic c) Screw jack d) Manual Winch e) Air Winches f) Electric Winch g) Constant Tension Winches a. Magnetic Slip Clutch

The required take-up length is calculated as follows, where . S Sp = take-up length (m) L = conveyor length (m) ε = belt elongation, elastic and permanent (%) As a rough guideline, use 1,5 % elongation for textile belts. and 0,2 % for steel cord belts. Note: For long-distance conveyors, dynamic start-up .

Model TA, (a slider bed conveyor) 11' long requires 1/2 Hp motor at 65 Feet per minute for a total load of 320 pounds. You desire your conveyor to operate at 90 Feet Per Minute. Calculate as follows: (1/2 X 90) / 65 = .69 You should select the next highest horsepower or 3/4 Hp. ...