WhatsApp)
Answer / australian. for cement, Dry volume=1.57 cum so 1.57/13=0.12*1440=173.90 kg Number of bags=174/50=3.5 bags and water=85 liters

1.00 cum 7 Cement mortar 1:4 cum Cement Sand 0.25 cum 1.00 cum 8 Cement mortar 1:5 cum Cement Sand 0.20 cum 1.00 cum 9 Cement mortar 1:6 cum Cement Sand 0.16 cum 1.00 cum 10 Cement mortar 1:8 cum Cement Sand 0.12 cum 1.00 cum 11 (a) Plum cement concrete 1:2:4 with 25% plums cum Plum Metal Cement Sand 0.21 cum 0.64 cum 0.16 cum 0.32 cum (b) Plum ...

Aug 03, 2016· The volume of PCC to be done is considered as 6 cubic meter which is to be done with M15 grade of concrete whose proportion is 1:2:4. This video should help you in following PCC quantity .

May 01, 2020· Quantity of Cement, Sand & Water required for Plastering. For 100m 2 of Wall, if first & second coat of cement mortar ratio 1:5 & 1:3 laid then. The Quantity of cement required = 574Kgs Calculated Quantity of Sand (Fine aggregate) required = 2560Kgs Quantity .

Volume of Sand required (using 1:4 proportion) = 0.036 x 4 = 0.144 x 1600 = 230 kgs (considering sand dry bulk density as 1600 kgs/cum.) Usually around 20% of water by weight of the total dry material is mixed in the mixture to achieve the desired workability.

Aug 01, 2019· In General Condition Lot of builders and Subcontractors are sublating this work on Sqft basis or Per Bag basis to Subcontractor or Concrete gang Who can do it on PCC Rs. 6.00/ Sqft and Plum Concrete in 8.50 to 9.00 Rs. Per Cuft that is 300 Per Cum

Oct 12, 2017· For Roof plaster mainly ratio we use = 1: 4 (1 part of cement and 4 part of sand). The thickness of plaster is between = 12 mm to 15 mm. Always use Good quality of cement (Different grades of cement) as well as good quality sand. Always use measuring box for measuring the quantity of sand and cement at the site.

The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose .

Strength of PCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 (n/mm 2 must be read as 'Newton's per millimeter Cubic') compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8.

Calculation of Cement and Sand in Mortar. Approximate method to determine the quantity of materials of mortar for 1cum brickwork divide 0.3 by the sum of the numerals of the proportion of materials which gives the quantity of cement in cum. Example – For brickwork in 1: 6 cement mortar = 0.3/ (1+6) = 0.043 cum

Send Quantity of Cement (no of Pakistani Cement Bags), Sand (unit=Cubic Feet) & Crush (unit=Cubic Feet)of 100 Cbic Feet concrete in Ratios as below: ... 1)PCC 1:4:8 – 40mm and down size. 2)RCC 1:3:6 – 20mm and down size ... send me all the design calculation and mix proportions for the following list and also the consumption coefficients of ...

Required volume of Cement Mortar = plastering area x plastering thickness = 100 x 0.012 = 1.2 m 3. Adding Bulking of Sand & Wastage. So to get 1.2 m 3 of wet cement mortar, we have to multiply the dry volume by 1.55.. What is 1.55 constant in the calculation?

1. Calculate the dry volume of materials required for 1m 3 cement mortar. Considering voids in sands, we assume that materials consists of 60% voids. That is, for 1m 3 of wet cement mortar, 1.6m 3 of materials are required. 2. Now we calculate the volume of materials used in cement .

Oct 13, 2017· Suppose we have to construct the wall having a volume of the 1-meter cube, the size of brick is going to use is 190 mm ×90 mm ×90 mm and mortar is 8 mm thick with the ratio of 1: 4. So. 1.) Calculate the number of bricks?. 2.) The quantity of cement?. 3.) The quantity of sand?

Quantities of materials for concrete such as cement, sand and aggregates for production of required quantity of concrete of given mix proportions such as 1:2:4 (M15), 1:1.5: 3 (M20), 1:1:2 (M25) can be calculated by absolute volume method. This method is based on the principle that the volume of fully compacted concrete is equal to [.]

Plain Cement Concrete (PCC) is composed mixture of cement, aggregates, sand, water and chemical admixtures. Calculate portland cement concrete or PCC concrete mix design ratio in Cft and determine exactly how much quantity of cement, sand and aggregate is required for PCC construction.

If the ratio of PCC is 1:4:8 Quantity of Cement per cubic meter of concrete is =1 x 1.5/(1+4+8)=0.115 cu.m 1 bag cement appx=0.035 cu.m therefore No of bag=0.115/0.035 =3.3, Say 4 bag cement/cu.m

M20 (1 cement :1.5 sand :3 stone/brick aggregate). To determine the proportions you have to perform mix design, for this you have to find out the sp.gr. of cement, CA, FA, and water cement ratio ...

Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm.

Jun 30, 2017· 1. For wall plastering, Cement : Sand = 1 : 6. 2. For ceiling plastering, Cement : Sand = 1 : 4. 3. Thickness of plaster should be in between 12-15 mm. If an additional coat is required then do not do it at one go. 4. Use good quality of cement & Sand.

MATERIAL CALCULATION: CEMENT IN BAGS. 01. PCC 1:5:10 1440/5*0.45 129.60Kg 2.59 02. PCC 1:4:8(M 7.5) 1440/4*0.45 162.00Kg 3.24 03. PCC 1:2:4(M 15) 1440/2*0.45 324.00Kg 6.48 04. PCC 1:3:6(M 10) 1440/3*0.45 216.00Kg 4.32 ... 230mm Wall/m3 = 460 Bricks + 20Cft Sand +66Kg Cement. SSM 1:7/m3 = Slize 95 + Soiling 8 Cft +60.5 Kg Current = 1000 Watts ...

Oct 15, 2017· Points should be remembered while calculating the quantity of cement, sand for plastering work. For wall plastering, the ratio of Cement : Sand = 1 : 6. For ceiling plastering, the ratio of Cement : Sand = 1 : 4. Thickness of plaster varies according to type of work generally it is 6mm and 12-15mm. Use good quality of cement & Sand for plastering.

Jan 01, 2019· How to Calculate Quantity for Cement, Sand & Aggregate in Concrete. sketching tips,quantity surveyor courses,quantity surveyor responsibilities in construction pdf,quantity .

Sep 21, 2017· Quantity of Materials in Kgs = Dry Volume of Materials X (Portion of materials in Ratio / Sum of Ratios ) X Density of Materials . 1, Quantity of Cement in 1 CUM Concrete is = 1.54x 1/10 x 1440 = 221.76 Kgs. 2, Quantity of Sand in 1 CUM Concrete is = 1.54 x 3/10 x 1450 = 669.90 Kgs. 3, Quantity of Aggregates in 1 CUM Concrete is = 1.54 x 6/10 x ...